![]() Feasibility Study |
This set of sheets is for reviewing projects at GRIP Stages 1 and 2. |
![]() Form A Document |
This set of sheets is for reviewing the Form A document that has been submitted with a design, usually at GRIP Stage 4. |
![]() Form A General Arrangement Drawing |
This set of sheets is for reviewing and checking the Form A General Arrangement (Horizontal Alignment) design drawing (GRIP Stage 4). |
![]() Form A and B Vertical Alignment Drawing |
This set of sheets is for reviewing and checking the Long Section (Vertical Alignment) design drawing, submitted with either the Form A or Form B (GRIP Stages 4 or 5). |
![]() Form B Document and General Arrangement Drawing |
This final set of sheets is for reviewing and checking the Form B document and General Arrangement (Horizontal Alignment) design drawing (GRIP Stage 5). |